Holy Rosary P.S.

Client:
Holy Rosary P.S.

Architect:
Education Authority,

Belfast Region

Completion Date:
September 2015

Works involved the demolition and removal of a redundant mobile, along with the design, manufacture and supply of a steel framed double modular classroom at Holy Rosary PS, Belfast.

The double classroom (160 sq. m) incorporates two large classroom areas, two stores, lobby, cloak room, boys & girls WC & disabled WC facilities.